CAPA Modular
Rua Ribeiro Cambado 4440-695 1491 Norte Alto da Serra - Valongo, Portugal
+351 224 219 600 +351 224 219 609 comercial@capamodular.com PME Líder, PME Excelência, TÜV Rheinland ISO 9001:2008 CAPA Modular 452083025
CAPA, S.A.
1999 https://capamodular.com/uploads/seo/big_1520865216_8739_CAPA_Modular.png
100 49
501628010

Projects

Modular Prefabricated Bank - Chibuto - Gaza, Mozambique

Modular Prefabricated Bank - Chibuto - Gaza, Mozambique

Location: Chibuto - Gaza, Mozambique   Prefabricated building erected in a modular construction with an area of ??more than 90 m² and whose space is divided by:   • Customer service area; • ATM boxes; • Backoffice cabinets;  • Cup; • Commissary;  • Technical area;  • Fully equipped toilets.   The prefabricated construction...
Modular Sports Pavillion Famalicão - Braga, Portugal

Modular Sports Pavillion Famalicão - Braga, Portugal

Location: Famalicão - Braga, Portugal   The prefabricated building of the new sports pavilion, in Vila Nova de Famalicão, was conducted under the Navtech technology developed by CAPA, and enabled a fast quality and low cost construction to the client.   Dimensions: • 22.5 meters long and 13 meters wide • Ceiling height of 6 meters, • Total SAA indoor 300 m².   Equipment: • 2 complete bathrooms • 2 changing rooms...
Warehouse / Pavilion Modular Prefabricated CAPA - Valongo, Porto - Portugal

Warehouse / Pavilion Modular Prefabricated CAPA - Valongo, Porto - Portugal

Location: Valongo, Porto - Portugal   Warehouse erected in prefabricated building, which is for storage of raw materials and finished products. The innovative technology Navtech designed by CAPA let its construction being performed with high quality standards, at a low cost.     Dimensions:   • 20 meters long x 20 meters wide; • Ceiling height of 6 meters; • Exact Covered Area 400 m²  ...
Base Vie, Peru

Base Vie, Peru

Location: Majes Siguas ll, Peru   Application of prefabricated modules in another work of CAPA in Latin America. This base vie serves as support for the execution of the water supply project to the Majes Siguas ll region, Peru, and is composed of: Accommodation Offices Industrial buildings Recreation Areas Canteen / Canteen Clinic   which covers a covered area of over 8500 m².
Modular Prefab School - Dili, East Timor

Modular Prefab School - Dili, East Timor

Location: Dili, Timor-Leste   It is a modular prefab school built by CAPA and is under the purview of the Madres Canossianas de Dili.   It is a building with a capacity of more than 80 students and includes:   • 4 classrooms fully furnished and equipped, • 1 staff room, • Sanitary • Outdoor space for recreation.   The construction of this modular complex with about 300 m² of covered area,...
Shelter Harbor Fisherman - Marina of Cascais, Portugal

Shelter Harbor Fisherman - Marina of Cascais, Portugal

Location: Cascais - Portugal      Modular prefabricated shelters built to serve as a haven for fishermen in the harbor of Cascais, District of Lisbon.     Time of completion: 7 days
Universidade Politécnica Tete - Moçambique

Universidade Politécnica Tete - Moçambique

Location: Tete, Mozambique    Polytechnic University of Tete in Mozambique, built usingCAPA's prefabricated modules.  Building consisting of classrooms, leisure rooms, toilets and ground play areas.
teste

teste

teste
AAAA

AAAA


Types of Construction

Modular Sports Pavillion Famalicão - Braga, Portugal

Location: Famalicão - Braga, Portugal   The prefabricated building of the new sports pavilion, in Vila Nova de Famalicão, was conducted under the Navtech technology developed by CAPA, and enabled a fast quality and low cost construction to the client.   Dimensions: • 22.5 meters long and 13 meters wide • Ceiling height of 6 meters, • Total SAA indoor 300 m².   Equipment: • 2 complete bathrooms • 2 changing rooms...
Modular Sports Pavillion Famalicão - Braga, Portugal

Warehouse / Pavilion Modular Prefabricated CAPA - Valongo, Porto - Portugal

Location: Valongo, Porto - Portugal   Warehouse erected in prefabricated building, which is for storage of raw materials and finished products. The innovative technology Navtech designed by CAPA let its construction being performed with high quality standards, at a low cost.     Dimensions:   • 20 meters long x 20 meters wide; • Ceiling height of 6 meters; • Exact Covered Area 400 m²  ...
Warehouse / Pavilion Modular Prefabricated CAPA - Valongo, Porto - Portugal

Modular Bank Building - Malanje, Angola

Location: Malanje - Angola   Modular bank building executed underprefabricated modular construction which has an area exceeding 130 m² and is divided by:   • Customer Service Area • ATM • Backoffices • Cup • Economat • Technical Area • Fully equipped restroom   The prefabricated branch was built on modular concrete bases and has a granite floor. The interior and exterior walls...
Modular Bank Building - Malanje, Angola